N.D. Admin. Code 4-12-10-07

Current through Supplement No. 394, October, 2024
Section 4-12-10-07 - Determinations required

When a bid or proposal is corrected or withdrawn, or a correction or withdrawal is denied, the procurement officer will prepare a written determination showing that the relief was granted or denied in accordance with these rules.

N.D. Admin Code 4-12-10-07

Effective August 1, 2004.

General Authority: NDCC 54-44.4-04

Law Implemented: NDCC 54-44.4-04