N.D. Admin. Code 33.1-24-07-45

Current through Supplement No. 394, October, 2024
Section 33.1-24-07-45 - Final standardized permit

The department shall consider all comments received during the public comment period in making a final permit decision. In preparing a final permit decision, the following provisions apply:

1. Section 33.1-24-07-01.
2. Section 33.1-24-07-48.
3. Subsections 4, 5, and 6 of section 33.1-24-07-08.
4. Section 33.1-24-07-09; however, in the context of the standardized permit, the reference to the public comment period is section 33.1-24-07-48 instead of section 33.1-24-07-06.
5. Section 33.1-24-07-10; however, in the context of the standardized permit, use the following reference: in subdivision a of subsection 1 of section 33.1-24-07-10 use reference to section 33.1-24-07-44 instead of section 33.1-24-07-04; in subdivision c of subsection 1 of section 33.1-24-07-10 use reference to section 33.1-24-07-48 instead of section 33.1-24-07-06; in subsection 2 of section 33.1-24-07-10 use reference to section 33.1-24-07-47 instead of section 33.1-24-07-06.
6. Section 33.1-24-07-11; however, in the context of the standardized permit, the reference to the public comment period is section 33.1-24-07-48 instead of section 33.1-24-07-06.
7. Section 33.1-24-07-12.
8. Section 33.1-24-07-49.
9. Section 33.1-24-07-14.

N.D. Admin Code 33.1-24-07-45

Adopted by Administrative Rules Supplement 370, October 2018, effective 1/1/2019.

General Authority: NDCC 23.1-04-03; S.L. 2017, ch. 199, § 1

Law Implemented: NDCC 23.1-04-03, 23.1-04-05, 23.1-04-08; S.L. 2017, ch. 199, § 19