Before transporting hazardous waste or offering hazardous waste for transportation offsite, a generator must package the waste in accordance with the applicable department of transportation regulations on packaging under 49 CFR parts 173, 178, and 179.
N.D. Admin Code 33.1-24-03-08
General Authority: NDCC 23.1-04-03; S.L. 2017, ch. 199, § 1
Law Implemented: NDCC 23.1-04-03, 23.1-04-05; S.L. 2017, ch. 199, § 19