E = 0.00084 (R)(T) (% H2S)
Where:
E = sulfur dioxide emission rate (tons/year).
R = the average daily amount of gas burned, incinerated and/or flared (thousand cubic feet per day at 60°F and 14.7 pisa - MCFD) based upon a thirty - day period. The thirty - day period must be the last thirty operating days of a one hundred eighty-day period following the completion or recompletion of a well. In cases where the well is shut in for extended periods during the one hundred eighty-day period following completion or recompletion, a case-by-case determination of PSD can be requested of the department.
T = days of operation per year (day/year). This number must be three hundred sixty-five unless there are verifiable physical limitations or a federally enforceable permit that limits the number of operating days.
% H2S = mole percent hydrogen sulfide content as determined by the most recent gas The formula is derived as follows:
Emissions from all onsite equipment at the production facility must be included in the total annual emission determination.
N.D. Admin Code 33.1-15-20-03
General Authority: NDCC 23.1-06-04; S.L 2017, ch. 199, § 1
Law Implemented: NDCC 23.1-06-04; S.L 2017, ch. 199, § 21