The owner or operator must review, and immediately amend the contingency plan, if necessary, whenever:
N.D. Admin Code 33-24-05-994
General Authority: NDCC 23-20.3-03
Law Implemented: NDCC 23-20.3-03, 23-20.3-04, 23-20.3-05
The owner or operator must review, and immediately amend the contingency plan, if necessary, whenever:
N.D. Admin Code 33-24-05-994
General Authority: NDCC 23-20.3-03
Law Implemented: NDCC 23-20.3-03, 23-20.3-04, 23-20.3-05