Before transferring ownership or operation of a facility during its operating life, the permittee must notify the new owner or operator in writing of the requirements of sections 33-24-05-950 through 33-24-05-1149 and sections 33-24-06-45 through 33-24-06-85.
N.D. Admin Code 33-24-05-1016
General Authority: NDCC 23-20.3-03
Law Implemented: NDCC 23-20.3-03, 23-20.3-04, 23-20.3-05