N.D. Admin. Code 33-24-05-432

Current through Supplement No. 393, July, 2024
Section 33-24-05-432 - Alternative standard for valves in gas or vapor service or in light liquid service - Skip period leak detection and repair
1. An owner or operator subject to the requirements of section 33-24-05-427 may elect for all valves within a hazardous waste management unit to comply with one of the alternative work practices specified in subdivisions b and c of subsection 2.
2.Requirements.
a. An owner or operator shall comply with the requirements for valves, as described in section 33-24-05-427, except as described in subdivisions b and c.
b. After two consecutive quarterly leak detection periods with the percentage of valves leaking equal to or less than two percent, an owner or operator may begin to skip one of the quarterly leak detection periods (for example, monitor for leaks once every six months) for the valves subject to the requirements in section 33-24-05-427.
c. After five consecutive quarterly leak detection periods with the percentage of valves leaking equal to or less than two percent, an owner or operator may begin to skip three of the quarterly leak detection periods (for example, monitor for leaks once every year) for the valves subject to the requirements in section 33-24-05-427.
d. If the percentage of valves leaking is greater than two percent, the owner or operator shall monitor monthly in compliance with the requirements in section 33-24-05-427, but may again elect to use this section after meeting the requirements of subdivision a of subsection 3 of section 33-24-05-427.

N.D. Admin Code 33-24-05-432

Effective December 1, 1991; amended effective December 1, 2003.
Amended by Administrative Rules Supplement 2016-359, January 2016, effective 1/1/2016.

General Authority: NDCC 23-20.3-03

Law Implemented: NDCC 23-20.3-03, 23-20.3-04