N.D. Admin. Code 33-24-02-185

Current through Supplement No. 393, July, 2024
Section 33-24-02-185 - Standards - Sampling connection systems
1. Each sampling connection system must be equipped with a closed-purge, closed-loop, or closed-vent system. This system must collect the sample purge for return to the process or for routing to the appropriate treatment system. Gases displaced during filling of the sample container are not required to be collected or captured.
2. Each closed-purge, closed-loop, or closed-vent system as required in subsection 1 must meet one of the following requirements:
a. Return the purged process fluid directly to the process line;
b. Collect and recycle the purged process fluid; or
c. Be designed and operated to capture and transport all the purged process fluid to a material management unit that complies with the applicable requirements of sections 33-24-02-204 through 33-24-02-206 or a control device that complies with the requirements of section 33-24-02-190.
3. In-situ sampling systems and sampling systems without purges are exempt from the requirements of subsections 1 and 2.

N.D. Admin Code 33-24-02-185

Adopted by Administrative Rules Supplement 2016-359, January 2016, effective 1/1/2016.

General Authority: NDCC 23-20.3-03

Law Implemented: NDCC 23-20.3-03, 23-20.3-04