19A N.C. Admin. Code 6B.0404

Current through Register Vol. 39, No. 9, November 1, 2024
Section 06B .0404 - ELIGIBLE COSTS

Costs eligible for RIAP funding are as follows:

(1) Reasonable engineering costs;
(2) Site preparation, including necessary grading and drainage to construct track(s);
(3) Track construction;
(4) Switches; and
(5) Grade crossings and signals.

19A N.C. Admin. Code 06B .0404

Authority G.S. 136-44.36; 143B-350(f) and (g);
Eff. April 30, 1997;
Amended Eff. April 1, 1999;
Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. October 24, 2015.
Authority G.S. 136-44.36; 143B-350(f) and (g);
Eff. April 30, 1997;
Amended Eff. April 1, 1999.