1 N.C. Admin. Code 41B.0508

Current through Register Vol. 39, No. 12, December 1, 2024
Section 41B .0508 - PRE-AWARD REPORTS

Before the award of a guaranteed energy savings contract, the qualified provider shall provide a report, as part of its proposal, which shall be available for public inspection, summarizing estimates of all costs of installation, maintenance, repairs and debt service and estimates of the amounts by which energy or operating costs will be reduced.

01 N.C. Admin. Code 41B .0508

Authority G.S. 143-64.17F;
Temporary Adoption Eff. August 1, 2003;
Temporary Adoption Expired April 27, 2004;
Eff. July 1, 2004;
Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. March 6, 2018.
Authority G.S. 143-64.17F;
Temporary Adoption Eff. August 1, 2003;
Temporary Adoption Expired April 27, 2004;
Eff. July 1, 2004.