Section 246.5 - Mercury Reduction Program facility-wide emission limits for existing units(a) Upon the effective date of this Part, the facility-wide mercury emission limitation contained in Table 1 will be in effect for the MRP mercury control periods of 2010 through December 31, 2014. Table 1 |
Facility | DEC Identification # | Facility-wide Hg Emission Limit (lb/year) 2010 - 2014 |
AES Cayuga | 7-0532-00019 | 73.0 |
AES Greenidge | 8-5736-00004 | 35.0 |
AES Somerset | 9-2938-00003 | 151.0 |
AES Westover | 7-0346-00045 | 30.0 |
Huntley Steam Generating | 9-1464-00130 | 110.0 |
Dunkirk Steam Generating | 9-0603-00021 | 106.0 |
Danskammer Generating Station | 3-3346-00011 | 72.0 |
Lovett Generating Station | 3-3928-00010 | 64.0 |
RGE - Russell Station | 8-2628-00068 | 48.0 |
Samuel A Carlson Generating Station | 9-0608-00053 | 8.0 |
Trigen Syracuse Energy Corp. | 7-3132-00052 | 21.0 |
Niagara Generation | 9-2911-00152 | 12.0 |
Black River Generation, LLC | 6-2240-00009 | 16.0 |
Total | 746.0 |
(b) The facility-wide emission limitations in subdivision (a) of this section represent the allowable mercury emissions for each MRP facility for the control periods in 2010 through 2014.(1) The sum of mass mercury emissions (in lb) from each applicable existing MRP unit at a MRP facility identified in Table 1 below shall not exceed the facility-wide mercury emission limitation (in lb/year) set forth in Table 1 beginning in the MRP control period of 2010 and continuing through 2014.(2) Compliance with the facility-wide mercury emission cap for each MRP control period will be based upon a 12-month total, rolled monthly, reported quarterly.(c) Forty pounds of mercury emissions are set aside for new MRP units and existing MRP units not in Table 1 of this section.N.Y. Comp. Codes R. & Regs. Tit. 6 § 246.5