N.Y. Comp. Codes R. & Regs. tit. 6 § 231-7.6

Current through Register Vol. 46, No. 25, June 18, 2024
Section 231-7.6 - Best available control technology (bact)
(a) For a proposed new or modified facility, BACT is required for each emission source that is part of the proposed new facility or modification, for all regulated NSR contaminants to be emitted by the proposed new facility or modification which equal or exceed the applicable significant project threshold listed in table 6 of Subpart 231-13 of this Part.
(b) For phased construction projects, the determination of BACT must be reviewed and modified as appropriate at the latest reasonable time which occurs no later than 18 months prior to commencement of construction of each independent phase of the project. At such time, the applicant may be required to demonstrate the adequacy of any previous determination of BACT for the new or modified facility.
(c) In establishing the final BACT limit, the department may consider any new information, including recent permit decisions, or public comment received, subsequent to the submittal of a complete application.
(d) BACT will not be established in final form until the final permit is issued.

N.Y. Comp. Codes R. & Regs. Tit. 6 § 231-7.6