N.Y. Comp. Codes R. & Regs. Tit. 16 §§ 1100-10.3

Current through Register Vol. 46, No. 53, December 31, 2024
Section 1100-10.3 - Post-Construction Compliance Filings
(a) Any updated information regarding the design, safety and testing for the wind turbines, solar panel, inverters, substation, transformer, and battery storage equipment to be installed during construction as well as information regarding the design, safety, and testing for any equipment installed during facility operation as a replacement of failed or outdated equipment shall be filed within fourteen (14) days of completion of all final post-construction restoration.
(b) As-built plans in both hard and electronic copies shall be filed within nine (9) months of the commencement of commercial operations of the facility and shall include the following:
(1) GIS shape files showing all components of the facility (wind turbine locations, solar panel array locations, electrical collection system, substation, buildings, access roads, met towers, point of interconnection, etc.);
(2) Collection circuit layout map; and
(3) Details for all facility component crossings of, and co-located installations of facility components with, existing pipelines: showing cover, separation distances, any protection measures installed, and locations of such crossings and co-located installations. Subpart 1100-11 Modifying, transferring or relinquishing permits.

N.Y. Comp. Codes R. & Regs. Tit. 16 §§ 1100-10.3

Transferred from 900-10.3 New York State Register July 17, 2024/Volume XLVI, Issue 29, eff. 6/26/2024