Section 88.4 - Exhibit e-4: engineering justification(a) The applicant shall: (1) provide the engineering justification for the proposed transmission line, showing its relation to the existing facilities of the applicant and the interconnected network;(2) indicate specific benefits with respect to reliability and economy to the applicant and the interconnected network;(3) state the proposed date for completion of the line and indicate the impact on the systems of the applicant and others of failure to complete the proposed transmission line on such date; and(4) provide appropriate system studies, showing expected flows on the line under normal, peak and emergency conditions, including the system reliability impact study forwarded by the Transmission Planning Advisory Subcommittee for approval by the operating committee of the New York Independent System Operator, which shows effects on stability of the interconnected system.N.Y. Comp. Codes R. & Regs. Tit. 16 § 88.4