N.Y. Comp. Codes R. & Regs. Tit. 10 §§ 5-2.9

Current through Register Vol. 46, No. 45, November 2, 2024
Section 5-2.9 - Completed works

Within 30 days of the completion of water well construction, the applicant or his agent shall:

(a) pump the well until the water is clear;
(b) disinfect the well in accordance with the requirements of the permit issuing official; and
(c) submit a well log to the permit issuing official. Such well log shall specify the well location, depth and diameter, formations penetrated, casing length, extent and nature of grouting, well output tests and associated water levels, and any other information required by the permit issuing official. In addition, analytical data of the water quality associated with such well shall be submitted when available.

N.Y. Comp. Codes R. & Regs. Tit. 10 §§ 5-2.9