N.M. Admin. Code § 6.10.3.11

Current through Register Vol. 36, No. 1, January 14, 2025
Section 6.10.3.11 - EXTENSION OF TIME LIMIT

An extension of the time limit under 6.10.3.9 NMAC and 6.10.3.10 NMAC of this rule will be permitted by the secretary of education or designee only if exceptional circumstances exist with respect to a particular complaint.

N.M. Admin. Code § 6.10.3.11

12-31-98; 6.10.3.11 NMAC - Rn, 6 NMAC 1.5.1.11 & A, 11-30-00; A, 10-17-05