N.M. Admin. Code § 3.3.35.8

Current through Register Vol. 35, No. 20, October 22, 2024
Section 3.3.35.8 - GENERAL PROVISIONS
A. The 2021 sustainable building tax credit may be claimed for taxable years prior to January 1, 2028.
B. A tax credit provided in 3.3.35.8 NMAC may not be claimed with respect to the same sustainable building under the 2021 sustainable building tax credit provided in the Corporate Income and Franchise Tax Act, for which a credit under the 2015 sustainable building tax credit pursuant to the Income Tax Act or the Corporate Income and Franchise Tax Act has already been claimed.
C. A person who is the owner of a building in New Mexico constructed to be a sustainable building or permanently installed manufactured housing and receives certification on or after January 1, 2022, may receive a certificate of eligibility for a sustainable building tax credit. A subsequent purchaser of a sustainable residential building may receive a certificate if no tax credit has previously been claimed for the building.
D. A person who is the owner of a commercial building having more than 20,000 square feet of temperature-controlled space and was built at least 10 years prior to the renovation or a building owner who has installed energy conservation products in an existing commercial or residential building having less than 20,000 square feet of temperature-controlled space on or after January 1, 2021, may receive a certificate of eligibility for a 2021 sustainable building tax credit.
E. The annual total amounts in a calendar year of the 2021 sustainable building tax credit pursuant to the Income Tax Act and Corporate Income and Franchise Tax Act available to taxpayers owning sustainable residential buildings is $2,000,000, for sustainable commercial buildings is $1,000,000 and for sustainable manufactured housing is $250,000. Any excess funds not used in a taxable year shall not be carried forward to subsequent years. When the cap is reached in any category in a given year based on all certificates of eligibility the department has issued, the department shall:
(1) if part of the eligible 2021 sustainable building tax credit is within the annual cap and part is over the annual cap, issue a certificate of eligibility for the amount under the annual cap for the applicable tax year and issue a certificate of eligibility for the balance in a subsequent tax year, except for the last taxable year when the 2021 sustainable building tax credit is in effect;
(2) issue certificates of eligibility to applicants who meet the requirements for the 2021 sustainable building tax credit in a taxable year when applications in one sustainable building category exceed the annual cap in another sustainable building category and other categories are under the annual cap as determined by February 1 of any year in which the tax credit is in effect; or
(3) if no 2021 sustainable building tax credit funds are available, issue a certificate of eligibility for the next subsequent tax year in which funds are available, except for the last taxable year when the 2021 sustainable building tax credit is in effect.
F. Funding for renovation of commercial buildings is $1,000,000 and for energy conservation products $2,900,000.
G. In the event of a discrepancy between a requirement of 3.3.35 NMAC and an existing New Mexico taxation and revenue department rule promulgated before 3.3.35 NMAC's adoption, the existing rule governs.
H. All notices and applications required to be submitted to the department under 3.3.35 NMAC shall be submitted to the energy conservation and management division of the department.
I. New Mexico general requirements.
(1) Sustainable buildings shall have the internet connections capable of connecting to a broadband provider.
(2) New sustainable residential buildings shall be electric vehicle ready. The parking space shall be equipped with one 40 ampere, 208 volt or 240 volt dedicated branch circuit for charging electric vehicles. The termination point can be a receptacle or junction box and shall be near where electric vehicles can easily be charged. The extension cord shall be long enough to reach to a vehicle and meet electric code and electric vehicle manufacturing requirements.
(3) New sustainable commercial buildings shall be electric vehicle ready with at least ten percent of the parking spaces capable of charging electric vehicles and for residential buildings at least one parking space. All parking spaces required to be capable of charging electric vehicles shall be equipped with one 40 ampere, 208 volt or 240 volt dedicated branch circuit for charging electric vehicles. The termination point can be a receptacle or junction box and shall be near where electric vehicles can easily be charged. The extension cord shall be long enough to reach to a vehicle and meet electric code and electric vehicle manufacturing requirements.
(4) A fully electric new building shall have a permanent supply of only electricity for space heating, water heating, cooking appliances, clothes washing, clothes drying, dish washing, pools and spas. No natural gas or propane plumbing shall be installed. This is only required to obtain the 2021 sustainable building tax credit for fully electric new buildings.
(5) A fully electric existing building shall have a permanent supply of only electricity for space heating, water heating, cooking appliances, clothes washing, clothes drying, pools and spas. The existing building shall not be connected to natural gas or propane energy supplies. Existing natural gas or propane plumbing does not need to be removed for purpose of this provision, so long as it is disconnected. This is only required to obtain the 2021 sustainable building tax credit for fully electric new buildings.
(6) Sustainable building projects shall follow the latest LEED rating system requirements as established by the United States green building council or the latest build green New Mexico requirements.
J. Build green New Mexico sustainable single-family residential requirements.
(1) Build green emerald shall:
(a) comply with watersense standards for indoor plumbing fixtures and water using appliances that, on average, have flow rates equal to or lower than the flow rates required for certification;
(b) include one waterline in the front and one waterline in the back, below the frost line, that can be connected to a drip irrigation system if landscaping area is available; and
(c) use forty percent less energy than is required by following the prescriptive path of the most current residential energy conservation code adopted by the construction industries division of the regulation and licensing department.
(2) Build green gold shall:
(a) comply with watersense standards for indoor plumbing fixtures and water using appliances that, on average, have flow rates equal to or lower than the flow rates required for certification;
(b) include one waterline in the front and one waterline in the back, below the frost line, that can be connected to a drip irrigation system if landscaping area is available; and
(c) use thirty percent less energy than is required by following the prescriptive path of the most current residential energy conservation code adopted by the construction industries division of the regulation and licensing department.
(3) Build green New Mexico shall use department approved verifiers to determine a building project has met certain prerequisites and performance benchmarks or credits within each category of the build green New Mexico rating system resulting in the issuance of a certification document.
K. Net zero homes shall be determined using an energy rating system index that gives a numerical score to a building where 100 represents the energy use of a home relative to the 2006 International Energy Conservation Code and 0 is equivalent to a net zero home.

N.M. Admin. Code § 3.3.35.8

Adopted by New Mexico Register, Volume XXVI, Issue 24, December 30, 2015, eff. 12/30/2015, Repealed by New Mexico Register, Volume XXXIII, Issue 03, February 8, 2022, eff. 2/8/2022, Adopted by New Mexico Register, Volume XXXIII, Issue 13, July 12, 2022, eff. 7/12/2022