Current through Register Vol. 36, No. 1, January 14, 2025
Section 3.3.14.17 - INSPECTION OF SOLAR ENERGY SYSTEMSA. The only inspection required through this application process for certification of an applicant's solar energy system are an inspection by the applicable building code authority for building, electrical, or mechanical code compliance, as applicable to the solar energy system type, if applicable. An applicant should be aware that their electric utility company may require additional inspections for photovoltaic systems that are interconnected to the distribution grid of that electric utility company. The applicant is solely responsible for compliance with such requirements.B. For purposes of monitoring compliance with 3.3.14 NMC, the department or its authorized representative shall have the authority to inspect a solar system owned by an applicant who has submitted an application for certification, upon the department providing five days' notice to the applicant."N.M. Admin. Code § 3.3.14.17
Adopted by New Mexico Register, Volume XXXI, Issue 16, August 25, 2020, eff. 8/25/2020, Amended by New Mexico Register, Volume XXXIII, Issue 23, December 13, 2022, eff. 12/13/2022, Adopted by New Mexico Register, Volume XXXV, Issue 13, July 16, 2024, eff. 7/16/2024