N.M. Code R. § 20.2.99.140

Current through Register Vol. 35, No. 11, June 11, 2024
Section 20.2.99.140 - REQUIREMENTS FOR ADOPTION OR APPROVAL OF PROJECTS BY OTHER RECIPIENTS OF FUNDS DESIGNATED UNDER TITLE 23 U.S.C. OR THE FEDERAL TRANSIT LAWS
A. Except as provided in Subsection B of 20.2.99.140 NMAC, no recipient of federal funds designated under title 23 U.S.C. or the federal transit laws shall adopt or approve a regionally significant highway or transit project, regardless of funding source, unless the recipient finds that the requirements of one of the following are met:
(1) the project comes from the currently conforming transportation plan and TIP (or meets the requirements of Subsection B of 20.2.99.111 NMAC during the 12-month lapse grace period), and the project's design concept and scope have not changed significantly from those that were included in the regional emissions analyses for that transportation plan and TIP; or
(2) the project is included in the regional emissions analysis for the currently conforming transportation plan and TIP conformity determination (or meets the requirements of Subsection B of 20.2.99.111 NMAC during the 12-month lapse grace period), even if the project is not strictly included in the transportation plan or TIP for the purpose of MPO project selection or endorsement, and the project's design concept and scope have not changed significantly from those which were included in the regional emissions analysis; or
(3) a new regional emissions analysis including the project and the currently conforming transportation plan and TIP demonstrates that the transportation plan and TIP would still conform if the project were implemented (consistent with the requirements of 20.2.99.137 NMAC and/or 20.2.99.138 NMAC for a project not from a conforming transportation plan and TIP).
B. In isolated rural nonattainment and maintenance areas subject to Subsection N of 20.2.99.128 NMAC, no recipient of federal funds designated under title 23 U.S.C. or the federal transit laws shall adopt or approve a regionally significant highway or transit project, regardless of funding source, unless the recipient finds that the requirements of one of the following are met:
(1) the project was included in the regional emissions analysis supporting the most recent conformity determination that reflects the portion of the statewide transportation plan and TIP which are in the nonattainment or maintenance area, and the project's design concept and scope has not changed significantly; or
(2) a new regional emissions analysis including the project and all other regionally significant projects expected in the nonattainment or maintenance area demonstrates that those projects in the statewide transportation plan and statewide TIP which are in the nonattainment or maintenance area would still conform if the project were implemented (consistent with the requirements of 20.2.99.137 NMAC and/or 20.2.99.138 NMAC for projects not from a conforming transportation plan and TIP).
C. Notwithstanding Subsections A and B of section 20.2.99.140 NMAC, in nonattainment and maintenance areas subject to Subsections L or M of section 20.2.99.128 NMAC for a given pollutant/precursor and NAAQS, no recipient of federal funds designated under title 23 U.S.C. or the federal transit laws shall adopt or approve a regionally significant highway or transit project, regardless of funding source. Unless the recipient finds that the requirements of one of the following are met for that pollutant/precursor and NAAQS:
(1) the project was included in the most recent conformity determination for the transportation plan and TIP and the project's design concept and scope has not changed significantly; or
(2) the project as included in the most recent conformity determination that reflects the portions of the statewide transportation plan and statewide TIP which are in the nonattainment or maintenance area, and the project's design concept and scope has not changed significantly.

N.M. Code R. § 20.2.99.140

12/14/94; 11/23/98; 20.2.99.140 NMAC - Rn, 20 NMAC 2.99.140 10/31/02; A, 10/15/05; A, 06/01/09; A, 11/07/11