Current through Register Vol. 35, No. 20, October 22, 2024
Section 20.11.60.2 - SCOPEA. 20.11.60 NMAC establishes a pre-construction permit program for new major stationary sources and major modifications of existing major stationary sources located within a nonattainment area.B. Exempt: 20.11.60 NMAC does not apply to sources within Bernalillo county, which are located on indian lands over which the Albuquerque-Bernalillo county air quality control board lacks jurisdiction.N.M. Admin. Code § 20.11.60.2
20.11.60.2 NMAC - Rp, 20.11.60.2 NMAC, 1/23/06; A, 8/30/10