N.M. Code R. § 20.11.46.22

Current through Register Vol. 35, No. 12, June 25, 2024
Section 20.11.46.22 - PROTOCOL WEB 2: PREDICTIVE FLOW MONITORING SYSTEMS FOR KILNS WITH POSITIVE PRESSURE FABRIC FILTER
A. Applicability. The provisions of this protocol are applicable to cement kilns or lime kilns that:
(1) are controlled by a positive pressure fabric filter;
(2) combust only a single fuel, no fuel blends; and
(3) have operating conditions upstream of the fabric filter that the WEB source documents would reasonably prevent reliable flow monitor measurements; and this protocol does not modify the SO2 monitoring requirements in 20.11.46.16 NMAC.
B. Monitoring requirements.
(1) A cement or lime kiln with a positive pressure fabric filter shall use a predictive flow monitoring system (PFMS) to determine the hourly kiln exhaust gas flow.
(2) A PFMS is the total equipment necessary for the determination of exhaust gas flow using process or control device operating parameter measurements and a conversion equation, a graph, or computer program to produce results in cubic feet per hour.
(3) The PFMS shall meet the following performance specifications:
(a) sensor readings and conversion of sensor data to flow in cubic feet per hour must be automated;
(b) the PFMS must allow for the automatic or manual determination of failed monitors; and at a minimum a daily determination must be performed;
(c) the PFMS shall have provisions to check the calibration error of each parameter that is individually measured; the owner or operator shall propose appropriate performance specifications in the initial monitoring plan for all parameters used in the PFMS comparable to the degree of accuracy required for other monitoring systems used to comply with 20.11.46 NMAC; the parameters shall be tested at two levels, low: 0 to 20 percent of full scale, and high: 50 to 100 percent of full scale; and the reference value need not be certified;
(d) the relative accuracy of the PFMS must be less than or equal to 10.0 percent of the reference method average value, and include a bias test in accordance with Paragraph (3) of Subsection D of 20.11.46.22 NMAC.
C. Certification requirements. The PFMS is subject to initial certification testing. The source owner or operator shall:
(1) demonstrate the ability of the PFMS to identify automatically or manually a failed monitor;
(2) provide evidence of calibration testing of all monitoring equipment; and any tests conducted within the previous 12 months of operation that are consistent with the QA/QC plan for the PFMS are acceptable for initial certification purposes; and
(3) perform an initial relative accuracy test over the normal range of operating conditions of the kiln. Using the results of the relative accuracy test audit, conduct a bias test in accordance with Appendix A to 40 CFR Part 75; and calculate and apply a bias adjustment factor if required.
D. Quality-assurance and quality control requirements. A quality-assurance and quality control plan shall be developed and implemented for each PFMS in compliance with Sections 1 and 1.1 of Appendix B of 40 CFR Part 75, and the following:
(1) perform a daily monitor failure check;
(2) perform calibration tests of all monitors for each parameter included in the PFMS; at a minimum, calibrations shall be conducted prior to each relative accuracy test audit; and
(3) perform a relative accuracy test audit and accompanying bias test once every four operating quarters; and calculate the relative accuracy (and bias adjustment factor) as described in 20.11.46.21 NMAC and 40 CFR Part 75; an out of control period occurs whenever the flow relative accuracy is greater than 10.0 percent of the mean value of the reference method.
E. Missing data. For any period in which valid data are not being recorded by the PFMS specified in 20.11.46.22 NMAC, hourly missing or invalid data shall be replaced with substitute data in accordance with the flow monitor missing data requirements for non-load based units in Subpart D of 40 CFR Part 75.
F. Monitoring plan requirements. In addition to the general monitoring plan requirements of 20.11.46.16 NMAC, the owner or operator shall meet the following additional requirements:
(1) the monitoring plan shall document the reasons why stack flow measurements upstream of the fabric filter are unlikely to provide reliable flow measurements over time;
(2) the initial monitoring plan shall explain the relationship of the proposed parameters and stack flow, and discuss other parameters considered and the reasons for not using those parameters in the PFMS; and the department may require that the subsequent monitoring plan include additional explanation and documentation for the reasonableness of the proposed PFMS.

N.M. Code R. § 20.11.46.22

20.11.46.22 NMAC - N, 12/31/03; A, 5/16/11