N.M. Admin. Code § 20.11.46.13

Current through Register Vol. 35, No. 20, October 22, 2024
Section 20.11.46.13 - REGISTRATION
A. Deadlines.
(1) Each source that is a WEB source on or before the program trigger date shall register by submitting the initial certificate required in Subsection A of 20.11.46.12 NMAC to the department no later than 180 days after the program trigger date.
(2) Any existing source that becomes a WEB source after the program trigger date shall register by submitting the initial certificate required in Subsection A of 20.11.46.12 NMAC to the department no later than September 30 of the year following the inventory year in which the source exceeded the emission threshold (100 tons SO2).
(3) Any new WEB source shall register by submitting the initial certificate required in Subsection A of 20.11.46.12 NMAC to the department prior to the commencement of operation.
B. Integration into permits.
(1) Any allocation, transfer or deduction of allowance to or from the compliance account of a WEB source shall not require revision of the WEB source's operating permit under 20.11.42 NMAC.
(2) After 20.11.46 NMAC is effective, a WEB source that is not required to have a permit under 20.11.41 NMAC, 20.11.60 NMAC or 20.11.61 NMAC, must at all times possess a valid 20.11.42 NMAC permit that includes the requirements of 20.11.46 NMAC. If the WEB source does not possess a Title V permit under 20.11.42 NMAC, it may satisfy the requirements of Paragraph (2) of Subsection B of 20.11.46.13 NMAC by obtaining or modifying a permit under 20.11.41 NMAC, 20.11.60 NMAC or 20.11.61 NMAC that incorporates the requirements of 20.11.46 NMAC. The source must at all times possess a valid permit that includes these requirements.

N.M. Admin. Code § 20.11.46.13

20.11.46.13 NMAC - N, 12/31/03; A, 5/16/11