Traffic signal synchronization projects may be approved, funded and implemented without satisfying the requirements of 20.11.3 NMAC. However, all subsequent regional emissions analyses required by 20.11.3.118 NMAC and 20.11.3.119 NMAC for transportation plans, TIPs or projects not from a conforming plan and TIP shall include such regionally significant traffic signal synchronization projects.
N.M. Admin. Code § 20.11.3.128