TABLE 1. CONFORMITY CRITERIA
All Actions at all times: | |
20.11.3.110 NMAC | Latest planning assumptions |
20.11.3.111 NMAC | Latest emissions model |
20.11.3.112 NMAC | Consultation |
Transportation Plan: | |
Subsection B of 20.11.3.113 NMAC | TCMs. |
20.11.3.118 or 20.11.3.119 NMAC Emissions budget or interim emissions | |
TIP: | |
Subsection C of 20.11.3.113 NMAC | TCMs. |
20.11.3.118 or 20.11.3.119 NMAC Emissions budget or interim emissions | |
Project (from a conforming plan and TIP): | |
20.11.3.114 NMAC | Currently conforming plan and TIP |
20.11.3.115 NMAC | Project from a conforming plan and TIP |
20.11.3.116 NMAC | CO, PM10 and PM 25 hot-spots |
20.11.3.117 NMAC | PM10 and PM25 control measures |
Project (Not From a Conforming Plan and TIP): | |
Subsection D of 20.11.3.113 NMAC | TCMs. |
20.11.3.114 NMAC | Currently conforming plan and TIP |
20.11.3.116 NMAC | CO, PM10 and PM2.5 hot-spots |
20.11.3.117 NMAC | PM10 and PM25 control measures |
20.11.3.118 or 20.11.3.119 NMAC Emissions budget or interim emissions |
N.M. Admin. Code § 20.11.3.109