Surface mining activities shall be conducted in a manner that facilitates reclamation which will restore approximate premining recharge capacity, through restoration of the capability of the reclaimed areas as a whole, excluding coal processing waste and underground development waste disposal areas and fills, to transmit water to the ground water system. The recharge capacity shall be restored to a condition which:
N.M. Admin. Code § 19.8.20.2019