Each applicant for, or holder of, a replacement plan is responsible for the accuracy and sufficiency of all material information provided in support of the application to the state engineer before or after approval of the replacement plan. If an approved replacement plan proves to be insufficient to replace depletions, the state engineer may require the holder of a replacement plan to provide additional replacement water at any time during the term of the replacement plan or within a reasonable period after the term of the replacement plan if necessary to offset cumulative impacts.
N.M. Admin. Code § 19.25.13.35