N.M. Admin. Code § 19.15.28.9

Current through Register Vol. 36, No. 1, January 14, 2025
Section 19.15.28.9 - LOCATION REQUIREMENTS
A. The operator shall file with the division a GIS digitally formatted as-built map:
(1) for a new gathering pipeline or natural gas gathering system, no later than 90 days after placing the gathering pipeline or system into service;
(2) for an existing gathering pipeline or natural gas gathering system no later than 90 days after May 25, 2021; and
(3) for an addition to an existing gathering pipeline or natural gas gathering system, no later than 90 days after placing the addition into service.
B. To ensure proper field identification of a gathering pipeline in an emergency, the as-built map shall include a layer which identifies the pipeline size and construction material type.
C. No later than July 1st of each year, the operator shall file with the division an updated GIS digitally formatted as-built map of its gathering pipeline or natural gas gathering system, which shall include a GIS layer that identifies the date, location and volume of vented or flared natural gas of each emergency, malfunction and release reported to the division since 19.15.28 NMAC became applicable to the pipeline or system.
D. The operator may assert confidentiality for the GIS digitally formatted as-built map and GIS layer pursuant to Section 71-2-8 NMSA 1978.

N.M. Admin. Code § 19.15.28.9

Adopted by New Mexico Register, Volume XXXII, Issue 10, May 25, 2021, eff. 5/25/2021