The operator of a well used for injection of gas, air, water or other medium into a formation shall case the well with safe and adequate casing or tubing so as to prevent leakage, and set and cement the casing or tubing to prevent the movement of formation or injected fluid from the injection zone into another zone or to the surface around the outside of a casing string.
N.M. Admin. Code § 19.15.26.9