The proration period shall be at least six months and the division shall make the pool allowable and allocations of the pool allowable at least 30 days prior to each proration period.
N.M. Admin. Code § 19.15.21.9
The proration period shall be at least six months and the division shall make the pool allowable and allocations of the pool allowable at least 30 days prior to each proration period.
N.M. Admin. Code § 19.15.21.9