Section 17.9.589.9 - Specific Reliability Metrics Reporting RequirementsA. MAIFI is not required to be reported unless the utility has installed the necessary technology and has usage data for at least six months across eighty percent of its electric system.B. Activities that occur on MEDs should be separately analyzed and reported.C. A utility that provides electric service in more than one state may:(1) identify major events based on the reliability events experienced by the combined service territories; and(2) illustrate the effect of identifying major events based on reliability events experienced only in the New Mexico service territory.D. A utility may categorize interruptions into more detailed interruption cause categories that are subsets of the defined interruption cause code categories. The utility shall: (1) list sub-causes when weather is the primary interruption cause code;(2) list sub-equipment components when using the equipment interruption cause code;(3) include planned interruptions; and(4) include the utility's methodology of how it classifies interruptions.N.M. Admin. Code § 17.9.589.9
Adopted by New Mexico Register, Volume XXXV, Issue 18, September 24, 2024, eff. 9/24/2024