This rule was filed as NMPSC Rule 580.
N.M. Admin. Code tit. 17, ch. 3, pt. 580
Pre-NMAC History: The material in this part was derived from that previously filed with the Commission of Public Records-State Records Center and Archives.
G.O. 49, General Order No. 49, Cost Overrun Rule, 1/2/87.
NMPSC Rule 580, Cost Overrun Rule, 6/30/88.
History of Repealed Material: [RESERVED]