Current through Register Vol. 56, No. 21, November 4, 2024
Section 7:7A-7.3 - General permit 3- Discharge of return water(a) General permit 3 authorizes the discharge of return water from an upland, contained, dredged material management area into State open waters, and placement of a pipe above ground for the discharge through freshwater wetlands and/or transition areas, provided all applicable requirements at N.J.A.C. 7:7A-5.7 and 20.3 are met.(b) The dredging itself may also require other State and Federal permits.N.J. Admin. Code § 7:7A-7.3
Amended and recodified from 7:7A-5.3 by 49 N.J.R. 3849(a), effective 12/18/2017