Current through Register Vol. 56, No. 21, November 4, 2024
Section 7:7A-16.10 - Additional requirements specific to an application for a transition area waiver(a) In addition to meeting the requirements at N.J.A.C. 7:7A-16.2 and 16.7, an application for a transition area waiver shall meet the requirements of this section.(b) An application for a transition area waiver shall include the following: 1. A line delineation LOI issued under N.J.A.C. 7:7A-4.4, or a line verification LOI issued under N.J.A.C. 7:7A-4.5, if an LOI of either type has been issued. A presence/absence LOI issued under N.J.A.C. 7:7A-4.3 is not sufficient. If no LOI has been issued for the site, or if only a presence/absence LOI has been issued, the application shall include all information required for an application for a line delineation LOI or line verification LOI.2. A compliance statement that shall: i. Demonstrate that the proposed activity or project satisfies the requirements at N.J.A.C. 7:7A-8; andii. Describe the characteristics of the site and the location of all proposed regulated activities, potential impacts from the construction process, and, as applicable, any monitoring or reporting methods that will be used.(c) In addition to the information required at (b) above, an application for a special activity transition area waiver based upon an individual permit criteria under N.J.A.C. 7:7A-8.3(g) shall include the information required for an individual permit application at N.J.A.C. 7:7A-16.9(b).(d) In addition to the information required at (b) above, an application for a hardship transition area waiver under N.J.A.C. 7:7A-8.4 shall include the information contained in N.J.A.C. 7:7A- 13.1(i)4, 5, 7, and 8i, ii, and iii, and a statement indicating that the property owner has requested a hardship transition area waiver.N.J. Admin. Code § 7:7A-16.10
Adopted by 49 N.J.R. 3849(a), effective 12/18/2017Amended by 53 N.J.R. 514(b), effective 4/5/2021