N.J. Admin. Code § 7:45-5.5

Current through Register Vol. 56, No. 19, October 7, 2024
Section 7:45-5.5 - Modification of a general permit authorization
(a) If the holder of a general permit authorization proposes a change to the project for which a general permit authorization was issued, the holder shall submit a request for modification in writing and shall include sufficient information for the Commission's Executive Director to adequately review and consider the modification request. A holder of a general permit authorization may request:
1. A minor modification under (b) below; or
2. A major modification under (c) below.
(b) Correction of a typographical error that does not affect the terms of the authorization issued under the general permit is a minor modification that may be made to any authorization issued under a general permit.
(c) Any modification other than described at (b) above shall constitute a major modification. To obtain approval for a major modification, a holder of an authorization shall meet the same substantive and procedural standards that would apply to an application for authorization under a general permit, except that the application need only to address the portions of the authorization affected by the proposed modification. Portions of the authorization that are not affected by the proposed modification are not subject to further review, or other procedures that would apply to an application for a new general permit authorization.

N.J. Admin. Code § 7:45-5.5