Recent CPI-U - Base CPI-U | |
Inflation Factor=100 x | --------------------------- |
Base CPI-U |
Where:
100=Multiplier to convert fraction into percent
Recent CPI-U=the CPI-U for the August before January 1 of the next five-year period in Table 1. For example, a five-year period in Table 1 starts on January 1, 2015. The August before January 1, 2015 is August 2014. Therefore, the Recent CPI-U would equal the CPI-U for August 2014. Use the year as directed in Table 1.
Base CPI-U=the CPI-U for the sixth August before January 1 of the next five year period in Table 1. An exception is that the Base CPI-U for the five year period, January 1, 2010 through December 31, 2014, shall be the CPI-U for August 2003. Use the year as directed in Table 1.
Table 1 | |||
Five-Year Period | Base CPI-U | Recent CPI-U | New Jersey |
Register | |||
Publication | |||
January 1, 2010 through December 31, 2014 | August 2003 | August 2009 | November 2009 |
January 1, 2015 through December 31, 2019 | August 2009 | August 2014 | November 2014 |
January 1, 2020 through December 31, 2024 | August 2014 | August 2019 | November 2019 |
January 1, 2025 through December 31, 2029 | August 2019 | August 2024 | November 2024 |
January 1, 2030 through December 31, 2034 | August 2024 | August 2029 | November 2029 |
Table A-1
Registration fees
Activity | Basis | Amount |
January 1, 2025 through December 31, 2029 | ||
Registration for initial authorization, or renewal of authorization, to act under a General Permit: | ||
- Listed at N.J.A.C. 7:27-8.8(c), other than (c)12 | Per registration | $1,090 |
- Listed at N.J.A.C. 7:27-8.8(c)12 | Per registration | $1,090 |
Registration for initial authorization, or renewal of authorization, to operate a used oil space heater pursuant to N.J.A.C. 7:27-20.3 | Per registration | $1,090 |
Table A-2
Permit fees
Activity | Basis | Amount |
January 1, 2025 through December 31, 2029 | ||
Application for a preconstruction permit and operating certificate | Per first piece of equipment per initial permit application | $3,350 |
Per each additional piece of equipment per initial permit application | $790.00 | |
Application for environmental improvement pilot test | Per application | $1,120 |
Renewal of an operating certificate | Per first piece of equipment per operating certificate | $1,685 |
Per each additional piece of equipment per operating certificate | $450.00 | |
Application for a preconstruction permit and operating certificate revision | Per first new or changed piece of equipment per permit revision application | $3,350 |
Per each additional new or changed piece of equipment per permit revision application | $790.00 | |
Application for a compliance plan change | Per application | $1,120 |
Notice of a seven-day-notice change | Per notice | $1,120 |
Table A-3
Notice of amendment fees
Activity | Basis | Amount |
January 1, 2025 through December 31, 2029 | ||
Change in identifying information pursuant to N.J.A.C. 7:27-8.21(b)1 | Per facility | $235.00 |
Transfer of ownership pursuant to N.J.A.C. 7:27-8.21(b)2 | Per facility | $235.00 |
Change in equipment or stack designation pursuant to N.J.A.C. 7:27-8.21(b)3 | Per preconstruction permit and operating certificate amended | $235.00 |
A change listed at N.J.A.C. 7:27-8.21(b)4, 5, 6, or 8 | Per preconstruction permit and operating certificate amended | $1,120 |
Correction of a typographical error pursuant to N.J.A.C. 7:27-8.21(b)7 | Per preconstruction permit and operating certificate amended | $235.00 |
Change in identifying information on a registration form as specified pursuant to N.J.A.C. 7:27-8.21(d)1 | Per facility | $235.00 |
Transfer of ownership of a registered facility pursuant to N.J.A.C. 7:27-8.21(d)2 | Per facility | $235.00 |
Activity | Basis | Amount |
January 1, 2025 through December 31, 2029 | ||
1. Prevention of Significant Deterioration | ||
a. Determine PSD Applicability | Per Review | $11,150 |
b. Perform BACT Evaluation | Per Applicable Air Contaminant | $11,150 |
2. Sub 18 Emission Offsets | ||
a. Determine Sub 18 Applicability | Per Review | $11,150 |
b. Perform LAER Evaluation | Per Applicable Air Contaminant | $11,150 |
3. RACT - AEL | ||
a. Review Technology | Per Applicable Air Contaminant | $11,150 |
b. Prepare SIP Revision | Per SIP Revision | $5,580 |
4. Perform MACT Evaluation | Per MACT Standard | $3,350 |
5. Perform NSPS Evaluation | Per NSPS | $3,350 |
6. Perform SOTA Case-by-Case Evaluation | Per Applicable Air Contaminant | $11,150 |
7. Public Comment | ||
a. Post Public Notices | Per Public Comment Period | $1,120 |
b. Conduct Public Hearing | Per Hearing | $11,150 |
c. Prepare Response to Comments Document | Per Response | $565.00 |
Maximum Per Document | $11,150 | |
8. Ambient Air Monitoring | ||
a. Review Protocol | ||
i. For criteria pollutants, or for other pollutants or parameters for which EPA has provided guidance | Per Protocol | $3,350 |
ii. For other pollutants or parameters for which EPA has not provided guidance | Per Protocol | $5,580 |
b. Inspect Monitoring Locations and Equipment Installation | Per Inspection | $1,120 |
c. Review Quality Assurance Plan | ||
i. For criteria pollutants, or for other pollutants or parameters for which EPA has provided guidance | Per Plan | $3,350 |
ii. For other pollutants or parameters for which EPA has not provided guidance | Per Plan | $5,580 |
d. Review Data | Per Required Report | $1,120 |
e. Audit Equipment | Per Audit | $1,120 |
9. Air Quality Impact Analysis - PSD | ||
a. Evaluate Protocol | Per Protocol | $4,470 |
b. Review Screening Modeling | Per Review | $2,235 |
c. Review Refined Modeling | Per Review | $7,810 |
10. Air Quality Impact Analysis - non PSD | ||
a. Evaluate Protocol | Per Protocol | $2,235 |
b. Review Screening Modeling | Per Review | $2,235 |
c. Review Refined Modeling | Per Review | $3,350 |
11. Risk Assessment | ||
a. Evaluate Protocol | Per Protocol | $3,350 |
b. Review Risk Assessment | Per Review | $3,350 |
12. Testing | ||
a. Stack Test | ||
i. Evaluate Protocol (up to three probes) | Per Protocol Per Stack | $1,685 |
ii. Evaluate Protocol (more than three probes) | Per Protocol Per Stack | $2,235 |
iii. Review Testing Report (up to three probes) | Per Report Per Stack | $1,685 |
iv. Review Testing Report (more than three probes) | Per Report Per Stack | $2,235 |
b. Continuous Emission Monitors | ||
i. Evaluate Equipment Protocol | Per Protocol Per Stack | $1,120 |
ii. Evaluate Performance Specification Test Protocol | Per Protocol Per Stack | $1,120 |
iii. Review Testing Report | Per Report Per Stack | $1,120 |
c. On-site Monitoring of Sample Collection Pursuant to an Approved Source-Specific Testing Protocol | Per Day Per Person | $1,685 |
d. Periodic Monitoring Equipment Protocol | Per Protocol | $565.00 |
13. Periodic Compliance Inspection | Per Inspection Per Certificate | $905.00 |
N.J. Admin. Code § 7:27-8.6