Current through Register Vol. 56, No. 23, December 2, 2024
Section 7:1A-4.1 - Eligibility and criteria(a) Any local unit whose system includes an antiquated, damaged, or inadequate water supply interconnection in need of rehabilitation, or repair or consolidation, or whose system lacks interconnections which qualify either as Class A or as Class B interconnections, as further defined in 7:1A-4.2, is eligible for a loan in any application period where it satisfactorily completes the loan application process in a timely manner, meets the eligibility criteria set forth in this subchapter, receives the minimum priority score, and ranks high enough on the priority list to be funded. A local unit may apply for interconnections with privately owned as well as publicly owned systems. To receive a loan the project shall meet the following criteria to the satisfaction of the Department:1. Except for the Great Notch and New Brunswick--South River area interconnection projects the minimum priority score set out in 7:1A-4.2.2. The project shall be an independent and complete water supply interconnection project. An independent and complete project is one which by its implementation alone will accomplish the purpose set forth in the application and raise at least one of the systems interconnected closer to the status of Class A or B interconnections.3. The project shall have as its basic purpose the interconnection of water supply systems. It shall not be excessively expensive or cause unacceptable environmental damage.4. The project shall not conflict with any other State projects.5. The application shall be accompanied by adequate explanation of how the local unit plans to repay the loan and pay any other expenses necessary to fully complete and implement the project, the steps it has taken to implement this plan, and the steps it plans to take before receiving the loan that will guarantee that at the time of the signing of the loan award document it will be irrevocably committed to repay the loan and pay any other expenses necessary to fully complete and implement the project. The local unit shall comply with all standard loan provisions of the State of New Jersey.6. The application documents shall clearly state and document how the loan will accomplish the goal set out in the application; and7. No water supply interconnection project is eligible for a loan if construction on the project has commenced prior to filing of the loan application with the Department.N.J. Admin. Code § 7:1A-4.1
As amended, R.1984 d.232, effective 6/18/1984.
See: 16 New Jersey Register 631(a), 16 New Jersey Register 1479(a).
"Eligibility and criteria" was formerly codified at N.J.A.C. 7:1G-2.3.
(a): references were N.J.A.C. 7:1G-2.12.
Amended by R.1992 d.252, effective 6/15/1992.
See: 24 New Jersey Register 707(a), 24 New Jersey Register 2245(a).
"Applicant" changed to "local unit".