Section 7:14-2.6 - Engineer design activities: plan scale and plan updating
(a) On occasion, projects do not go to construction within a reasonable time after the bid advertisement. During this period, utilities may be relocated or installed, as well as other changes which can take place that are unknown to the contractor. Because of this, problems can take place during construction and result in numerous change orders and increases in the cost of the project.
(b) The horizontal scale for construction plans for sewerage facilities shall not be less than one inch equals 100 feet. A larger horizontal scale shall be used where appropriate to show sufficient detail to construct the project. The vertical scale for construction plans for sewerage facilities shall be not less than one inch equals 10 feet. Based upon the best information available, the location of underground utilities and support structures for overhead utilities shall be shown on the plans.
(c) Construction plans for sewerage facilities shall be updated whenever the bid advertisement date exceeds one year after approval by the responsible State or Federal regulatory agency. The engineer shall receive adequate compensation for updating plans and specifications. All such revisions shall be noted and dated on the plans prior to bid.

N.J. Admin. Code § 7:14-2.6