N.J. Admin. Code § 7:14-2.10

Current through Register Vol. 56, No. 17, September 3, 2024
Section 7:14-2.10 - Bid items for sewer pipe installation
(a) This section establishes bid items which shall be included in unit price contracts for sewer pipe installation where applicable.

DescriptionUnit of Measure
1.Test PitsCubic Yard
2.Stone Foundation (bedding)Cubic Yard
3.Select Material (below and above pipe grade)Cubic Yard
4.Rock Excavation (including removal and disposalCubic Yard
of boulders)
5.Wood Sheeting (install and remove where shownSquare Feet or1000
on plans)Board Feet
6.Wood Sheeting (left in place where shown onSquare Feet or1000
plans)Board Feet
7.Steel Sheeting (install and remove where shownSquare Feet orTons
on plans)
8.Steel Sheeting (left in place where shown onSquare Feet orTons
plans)
9.Permanent Pavement GravelSquare Yard
10.Pavement
i.Municipal:
(1)Temporary which shall be removedSquare Yard
(where applicable)
(2)BaseSquare Yard
(3)TopSquare Yard
ii.County:
(1)Temporary which shall be removedSquare Yard
(where applicable)
(2)BaseSquare Yard
(3)TopSquare Yard
iii.State:
(1)Temporary which shall be removedSquare Yard
(where applicable)
(2)BaseSquare Yard
(3)TopSquare Yard
11.TestingLinear Feet
12.Concrete Cradle or Encasement (to be identifiedCubic Yard
where applicable)

N.J. Admin. Code § 7:14-2.10