N.J. Admin. Code § 5:30-11.7

Current through Register Vol. 57, No. 1, January 6, 2025
Section 5:30-11.7 - Change orders for materials, supplies and equipment which are part of construction contract
(a) The requirements of this section shall apply only to change orders for materials, supplies and equipment which are part of construction contracts.
(b) In case of conflict with the general requirements of N.J.A.C. 5:30-11.3, the specific language of this section shall prevail but, otherwise, the requirements of N.J.A.C. 5:30-11.3 shall be satisfied.
(c) Change orders for materials, supplies and equipment items which are part of a contract which is primarily a construction contract shall be processed in accordance with the rules governing construction contracts. Contracts awarded on a unit price basis (including, but not limited to, asphalt overlays, curbing) as an open-end contract shall be handled under the section dealing with open-end contracts. However, contracts awarded for the paving, construction or reconstruction of specifically described streets, parking lots, or sections shall be treated as construction contracts.

N.J. Admin. Code § 5:30-11.7

Amended by R.2000 d.485, effective 12/4/2000.
See: 32 New Jersey Register 3237(a), 32 New Jersey Register 4300(a).
Rewrote (a); in (b), changed N.J.A.C. references throughout, and substituted a reference to this section for a reference to the particular section; and in (c), inserted a reference to parking lots.