N.J. Admin. Code § 19:66-8.10

Current through Register Vol. 56, No. 23, December 2, 2024
Section 19:66-8.10 - Final improvement plans
(a) Upon the approval of a preliminary plat, the applicant shall submit revised construction drawings for the improvements in accordance with the following:
1. Such drawings shall be submitted in triplicate to the Authority a minimum of 60 calendar days prior to the date of the submission of the application for final plat approval.
2. Such drawings shall be prepared, signed, and sealed by a New Jersey-licensed professional engineer.
3. Such drawings shall contain the following:
i. Plans, design details, specifications, and cost estimates for street construction, including a center-line profile and a grade line for each street with a typical cross-section of the roadway. The profiles of grade lines shall be shown at a scale of one inch equal to 100 feet horizontal, and one inch equal to 10 feet vertical. This information shall be shown on standard plan and profile sheets;
ii. Plans, design details, specifications, calculations, and cost estimates of proposed stormwater management facility improvements;
iii. Plans, design details, specifications, and cost estimates of proposed water supply and distribution systems;
iv. Plans, design details, specifications, and cost estimates of sanitary sewerage systems, including treatment plants;
v. Grading plans, lighting plans, street plantings, and monument locations; and
vi. Such other information as may be required by the Authority deemed necessary for the review of the improvements.
(b) The Authority shall review all construction drawings in order to determine whether the drawings are consistent with the approved preliminary plat and comply with the design standards of this chapter.
(c) In the event that the construction drawings are not consistent with the approved preliminary plat or do not comply with the design standards of this chapter, the Division shall notify the applicant in writing of the reasons why the drawings are inconsistent or do not comply. The applicant shall then correct and resubmit such drawings.
(d) The Authority engineer shall act upon the construction drawings submitted to the Authority at the same time or prior to the time that the Authority engineer acts upon the final plat.

N.J. Admin. Code § 19:66-8.10