This subchapter establishes the Authority's criteria and procedures for the use of a two-phase design-build selection process. In the first phase, the Authority initially ranks bidders based on statements of qualifications and then selects a short list of bidders to receive the RFP based on the ranking. In the second phase, the Authority receives the submission of price and technical proposals in response to the RFP and awards the design-build contract to the bidder whose proposal receives the highest overall score.
N.J. Admin. Code § 19:36-4.1
See: 44 N.J.R. 1318(a), 45 N.J.R. 752(a).
Rewrote the section.