DPMC shall evaluate each leased space proposal received in accordance with this subchapter and shall identify the proposals determined to be responsive to all material elements set forth in the Scope of Work, cost effective and best able to fulfill the space need as defined in the Scope of Work.
N.J. Admin. Code § 17:11-6.9
See: 40 N.J.R. 598(a), 40 N.J.R. 4599(a).
Substituted "DPMC" for "DPM&C" and substituted "Scope of Work" for "scope of work" twice.