N.J. Admin. Code § 16:47-4.27

Current through Register Vol. 56, No. 11, June 3, 2024
Section 16:47-4.27 - Unsignalized intersection standards
(a) The general standards listed in 16:47-4.2 4 apply to an unsignalized intersection. LOS will be measured by average total delay per Table 10-3 of the "1994 Highway Capacity Manual," Special Report 209, or superseding issue.
(b) The applicant shall perform the unsignalized intersection analysis for determining fair-share financial contributions, which should be based on the levels of service, delay, and traffic volumes at the appropriate peak hour. Turns may not cause excessive disruption to through traffic and may not be allowed when acceptance of substandard gaps is promoted. In some cases elimination of the movement and diversion of the demand to a nearby location is the preferred treatment. Comments on the interaction of conflicting movements at adjacent access points may be required.
(c) For a study location at street intersections, the maximum allowable build delay for each movement shall be determined as follows:
Maximum Allowable Build Delay in
No-BuildSeconds
Level of ServiceUrbanRural
A-B1515
C, D, E5 more than no-build,N/A
up to 45
C-DN/A5 more than no-build,
up to 30
EN/ANo worse than
no-build
FNo worse thanNo worse than
no-buildno-build
(d) For site driveways, the maximum allowable build delay for each movement shall be determined as follows:
Maximum Allowable Build Delay in
No-BuildSeconds
Level of ServiceUrbanRural
A-E4530
FNo worse thanNo worse than
no-buildno-build

N.J. Admin. Code § 16:47-4.27