Current through Register Vol. 57, No. 1, January 6, 2025
Section 16:25-3.8 - Restriction against varied use(a) The following precautionary measures are required for pipeline installations: 1. Pipeline installation permits will identify the transmittant, the maximum working, test, or design pressures, and the design standards for the carrier.2. When it is anticipated that there will be a change in the transmittant or an increase in the maximum design pressure specified in the permit, the utility shall notify the Department, through the Regional Maintenance Office, and obtain approval for such changes. The notice should specify the applicable codes to be used.N.J. Admin. Code § 16:25-3.8