Current through Register Vol. 57, No. 1, January 6, 2025
Section 16:20B-4.1 - Eligible costs(a) The Department will participate in the following: 1. One hundred percent of the cost of eligible construction or the project allotment, whichever is less; and2. The cost of construction inspection and material testing, up to a maximum of 15 percent of the final eligible construction cost of the project less any non-participatory items. Bituminous concrete adjustments are not included in this calculation.(b) The following costs are not eligible for Department participation: 1.Relocation costs of utility property and equipment owned by a private utility or a municipal or county utility authority; 2. Betterment of any utility property or equipment, whether publicly-owned, privately-owned, or owned by a municipal or county utility authority; and3. Engineering or right-of-way acquisition costs except for those deemed eligible pursuant to N.J.A.C. 16:20B-4.2.N.J. Admin. Code § 16:20B-4.1
Amended by 46 N.J.R. 868(a), effective 5/19/2014.