N.J. Admin. Code § 14:9-2.1

Current through Register Vol. 56, No. 9, May 6, 2024
Section 14:9-2.1 - Plant construction

All water and wastewater utilities shall ensure that the construction and installation of their plants and facilities comply with 14:3-2.1, Plant construction, and in addition, complies with the applicable provisions of Water Meters: Selection, Installation, Testing, and Maintenance (M6), 1999 Edition, published by the American Water Works Association, which is incorporated herein by reference, as amended and supplemented, and/or complies with all applicable standards governing construction and installation of plant and facilities found in publications of the American Water Works Association, including all supplements and amendments, and is available at http://www.awwa.org.

N.J. Admin. Code § 14:9-2.1

Amended by R.1996 d.207, effective 5/6/1996.
See: 28 N.J.R. 1190(a), 28 N.J.R. 2405(b).
Recodified from N.J.A.C. 14:9-1.1 and amended by R.2006 d.367, effective 10/16/2006.
See: 38 N.J.R. 1538(a), 38 N.J.R. 4490(b).
Rewrote the section. Former N.J.A.C. 14:9-2.1, Pressure and volume of water service, recodified to N.J.A.C. 14:9-3.1.