Section 14:9-10.6 - DSIC-eligible plant investments during a base rate case(a) In the event that DSIC-eligible plant additions are placed in service during the test year of a water utility's base rate case, if not recovered as part of a routine DSIC filing, those plant additions shall be considered as part of the base rate case proceeding, and included in the routine test-year plant additions, consistent with existing Board rules.(b) Notwithstanding the other provisions of this subchapter, a water utility may continue to make DSIC-eligible investments and collect a DSIC charge during a pending rate case filed in accordance with existing Board rules. (c) DSIC rates shall be rolled into base rates during a water utility's subsequent base rate case and the DSIC rate shall be reset to zero.N.J. Admin. Code § 14:9-10.6
Amended by 49 N.J.R. 2542(a), effective 8/7/2017