Section 14:5-2.1 - Plant construction(a) The construction and installation of plant and facilities of EDCs must be in accordance with all of the following, as they applied at the time of construction: 1.N.J.A.C. 14:3-2.1, except with respect to the protection and separation of conductors buried in earth, which is addressed in N.J.A.C. 14:5-2.2;2. The requirements of the National Electrical Code (NFPA 70), which is available at www.NFPA.org and;(b) All codes and standards referenced in (a) above are incorporated herein by reference including amendments and supplements thereto.N.J. Admin. Code § 14:5-2.1
Amended by 47 N.J.R. 2165(c), effective 8/17/2015Amended by 55 N.J.R. 312(b), effective 2/21/2023