N.J. Admin. Code § 14:17-11.3

Current through Register Vol. 56, No. 24, December 18, 2024
Section 14:17-11.3 - Extension of time limits

In instances where the Board's decision or order contains a specific time or date for compliance, and the petitioner desires extension of such time limit, petition to the Board through the Office shall be made in writing at least five days before the expiration of the time limit.

N.J. Admin. Code § 14:17-11.3