Conveyor tunnels or conveyor sheds constructed after the effective date of this chapter shall have an unobstructed passageway at least three feet wide and 6 1/2 feet high at one side of the conveyor.
N.J. Admin. Code § 12:185-20.11
See: 38 N.J.R. 3130(a), 38 N.J.R. 5165(b).
Substituted "chapter" for Chapter". Former N.J.A.C. 12:185-20.11, Rollers, recodified to N.J.A.C. 12:185-20.10.